MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The testing could not be completed on the elevator at this time. This elevator was placed on the “inactive” status in 2020, this “inactive” status was only authorized for 2 years. The elevator shall be returned to service or the elevator shall be decommissioned according to the State of Missouri requirements. Currently the power is disconnected and only a machine room inspection could be performed.
|
3/8/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The testing could not be completed on the elevator at this time. This elevator was placed on the “inactive” status in 2020, this “inactive” status was only authorized for 2 years. The elevator shall be returned to service or the elevator shall be decommissioned according to the State of Missouri requirements. Currently the power is disconnected and only a machine room inspection could be performed. A Category 5 test will need to be performed.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.3 - Lighting and receptacles
|
2.7.5.1 Lighting
|
|
|
There are a number of machine room lighting fixtures that are not operational on the day of inspection. Repair lighting for proper illumination for maintenance and emergency personnel.
|
3/26/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.7.5.2
|
|
|
The HVAC unit in the machine room shall be repaired to provide proper operation temperature for the elevator controller.
|
3/26/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.7.5.2
|
|
|
The HVAC unit in the machine room shall be repaired to provide proper operation temperature for the elevator controller.
|
7/27/2023
|
conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Seismic not working
|
3/25/2019
|
conversion
|
conversion
|
n/a
|
|
|
Fire Extinguisher out of date.
|
3/25/2019
|