MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
Provide on-site maintenance control program.
|
7/30/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6 General Maintenance Methods
|
|
|
Repair emergency battery lowering unit.
|
7/30/2021
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Battery lowering device is not working, needs to be repaired or replaced. Re-inspection required
|
5/13/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
OSV has to be tested in 90 days or less. Re-inspection required
|
5/13/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
OSV is not sealed. Perform OSV test on or before next annual inspection.
|
7/30/2021
|