Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 3.26.10 (Auxiliary Power)(Re-Inspection) x The auxiliary power lowering operation shall be functional. 8/27/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing This elevator is equipped with an overspeed valve. A category 5 test shall be performed on the overspeed valve on or before the next annual inspection. The valve shall be sealed and tagged after the category 5 test. 8/27/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.3 - Lighting and receptacles 2.7.5.1 Lighting The machine room lights shall be operational. 8/27/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.41 - Maintenance Records 8.6.1.4 A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022) 7/8/2021
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.6 - Ventilation 2.7.5.2 The machine room temperature shall be kept within the manufacturers recommended range. 8/27/2024