Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 2.27.2.3 (Elevator Emergency Power Illuminated Signal) x Emergency power jewel inoperable, reinspect to ensure elevators are operating on emergency generator power.
MO Minimum : Elevators (S) - Fire Service 8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection) x Phase II fire service does not work, needs repair. Re-inspection required 7/19/2023
MO Minimum : Elevators (S) - Fire Service 8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection) x x Phase II not operational , removed from service. 7/25/2023
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing (Re-Inspect) x OSV is due for full load test & have tripping speed checked. Re-inspection required 7/19/2023