Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) Yes No emg power couldnt be tested at time of insp 1/24/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 8.11.2.3.5 Yes No Emergency power not tested at time of inspection. 1/10/2024
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) Yes No emg.power couldnt be done at time of insp 10/29/2024
A17.1-2016 : Elevators 1.17 - Standby power operation 2.27.2 Yes No Return to test the emergency power. 11/12/2024
A17.1-2016 : Elevators 2.40 - Maintenance Records 8.6.1.2.2 On-Site Documentation No No procedures for performing insp an tests not on site 1/24/2022
A17.1-2016 : Elevators 6.5 -Acceptance Checklist for Firefighters' Service (ASME A17.1-2000 and CSA B44-00): Automatic Elevators 2.27.3 Yes Yes Return to test all initiating devices. 11/12/2024
MO Minimum : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate No No no current cirt displayed 9/10/2024