Missouri Minimum : Platform Lifts
|
(U) - Existing Vertical and Inclined Platform Lifts
|
(U)1 (Re-Inspect)
|
Yes
|
No
|
Unit is not working properly at the time of inspection. Main power disconnect switch was padlocked out, gate operator mechanism was taken apart. Last successful inspection of lift was in 2024. Unit shall be repaired and returned to service, or placed into INACTIVE status for no more than 2 years, then returned to service, or placed into OUT OF SERVICE status permanently or be remove with an out of service inspection to verify removal was performed.
|
|
|
Missouri Minimum : Platform Lifts
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) display of certificate
|
No
|
No
|
Post current State Elevator Certificate.
|
|
|
Missouri Minimum : Platform Lifts
|
(U) - Existing Vertical and Inclined Platform Lifts
|
(U)1 (Re-Inspect)
|
Yes
|
No
|
Unit shall have a full category 1 test performed and witnessed.
|
10/17/2024
|
|
ASME A18.1-2005 : Lifts & Chairlifts
|
11 CSR 40-5.090 Inspection and Testing
|
10 Routine, Periodic, and Acceptance inspections andTest
|
Yes
|
No
|
Unit not working properly at the time of inspection.
|
7/22/2025
|
|
Missouri Minimum : Platform Lifts
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) display of certificate
|
Yes
|
No
|
Post current State Elevator Certificate.
|
4/13/2026
|
|
Missouri Minimum : Platform Lifts
|
(U) - Existing Vertical and Inclined Platform Lifts
|
(U)1 (Re-Inspect)
|
Yes
|
No
|
Unit is not working properly at the time of inspection.
|
4/13/2026
|
|
ASME A18.1-2005 : Lifts & Chairlifts
|
2.1 - Runways
|
2.1.2.2
|
No
|
No
|
Power gates do not operate.
|
4/13/2026
|