n/a
|
|
|
The fire extinguisher in the machine room is expired.
|
2/1/2021
|
|
conversion
|
conversion
|
n/a
|
|
|
Remove all non-elevator related equipment from the elevator machine room.
|
2/1/2021
|
|
conversion
|
conversion
|
n/a
|
|
|
Sump hole in the pit shall be covered.
|
2/1/2021
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.6 Sump Pump Covers
|
|
|
The pit sump pump hole shall have a cover installed.
|
2/1/2021
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.37 - Pressure Switch
|
3.26.8 Pressure Switch
|
|
|
Pressure switch inoperable
|
1/19/2023
|
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)4
|
|
|
The elevator machine room cannot be used for storage. Remove the items being stored in the machine room to provide proper room for maintenance to be performed.
|
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
There shall be maintenance records kept in the elevator machine room accessible to the inspector depicting dates and descriptions of maintenance tasks performed, callbacks, examinations, tests, adjustments, replacements and wiring diagrams. This shall be in accordance to the requirements in the Maintenance Control Program. Electronic means has NOT been approved by the State of Missouri.
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.37 - Pressure Switch
|
3.26.8 Pressure Switch
|
x
|
|
Pressure switch inoperable. Re-inspection required
|
1/19/2023
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 - 8.6.4.13 - Door systems
|
x
|
|
Replace missing hoistway door gibb at 2nd floor landing. Re-inspection required
|
2/19/2025
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Auxiliary battery lowering device (emergency recue unit) does not work, needs repaired. Re-inspection required
|
2/19/2025
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Need to perform relief valve system pressure test. Re-inspection required
|
2/19/2025
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The testing has not been completed on the elevator at this time. The relief pressure test shall be performed and safeties set before the inspection is completed. The maintenance provider shall have the proper equipment to complete test.
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.37 - Pressure Switch
|
3.26.8 Pressure Switch
|
x
|
|
The low pressure switch shall be operational.
|
7/20/2020
|