conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Left side counter weight derailment wire does not activate seismic feature.
|
7/2/2018
|
conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Remove excess weight from car top.
|
7/2/2018
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
All the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
|
11/10/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
2-way communication device shall be operational with and without main power.
|
4/21/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Compliant/required documentation and MCP shall be kept in equipment room including wiring diagrams, fire service log, etc.
|
1/4/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Compliant/required documentation and MCP shall be kept in equipment room including wiring diagrams, fire service log, etc. Not properly documenting visits, inspections, and fire service testing.
|
2/15/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Inspection incomplete due to shutdown of elevator #1 during test. Still need to test: finals, soft set, UM, light, alarm, phone, EBR.
|
7/5/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.28 - Counterweight and counterweight buffer
|
2.21
|
|
|
Counterweight hold down clamps need to be set properly.
|
7/5/2024
|
A17.1-2016 : Elevators
|
3.22 - Wire rope fastening and hitch plate
|
2.20.9.5 Wedge Rope Sockets
|
|
|
2.20.9.4 - Hoist rope tail retaining clips shall be properly spaced & replaced.
|
7/5/2024
|