MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Emergency power did not connect to the elevators, needs repaired. Re-inspection required
|
2/24/2026
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.2.7
|
x
|
|
Elevators connected to a standby or emergency generator shall be tested for operation on standby or emergency power. Re-inspection required
|
1/21/2023
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.32 - Control Valve
|
8.11.3.1.2 (o)
|
x
|
|
Hydraulic control valve is leaking during relief valve test. Repair/replace within thirty (30) days.
|
12/17/2020
|