Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 5.11 - Plunger and Cylinder 3.18 The hydraulic cylinder gland packings are leaking excessively on both cylinders and shall be replaced.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 8.11.2.3.5 x Emergency return unit, battery lowering, inoperative. Repair. 8.6.1.6.3(e) 4/3/2019
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.41 - Maintenance Records 8.6.1.4 Provide maintenance control program on site documents. 10/20/2020
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.5 - Car lighting and receptacles 8.6.4.15 Emergency Lighting x The emergency car lighting is not operational, likely indicating that the back-up power device (battery) has failed. The fixture shall be repaired to operate. Reinspection required. 4/25/2022
A17.1-2016 : Elevators 5.15.2 Unsealed Overspeed Valve 8.6.5.16.5 (Re-Inspect) x This elevator has an OSV device installed that is not sealed and is required to have 5 yr full load test. Re-inspection required 9/25/2023
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing (Re-Inspect) x OSV is not sealed and needs to have a 5 yr full load test performed. Re-inspection required 5/29/2024
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements (G)1 Maintenance, Repair and Replacements x Emergency return unit (ERU) is inoperable. The ERU batteries shall be replaced in order for the ERU to conform to the ERU requirements. 9/17/2024