MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 Maintenance, Repair and Replacements
|
x
|
|
Emergency return unit (ERU) is inoperable. The ERU batteries shall be replaced in order for the ERU to conform to the ERU requirements.
|
9/17/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.11 - Plunger and Cylinder
|
3.18
|
|
|
The hydraulic cylinder gland packings are leaking excessively on both cylinders and shall be replaced.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.3.5
|
x
|
|
Emergency return unit, battery lowering, inoperative. Repair. 8.6.1.6.3(e)
|
4/3/2019
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Provide maintenance control program on site documents.
|
10/20/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.5 - Car lighting and receptacles
|
8.6.4.15 Emergency Lighting
|
x
|
|
The emergency car lighting is not operational, likely indicating that the back-up power device (battery) has failed. The fixture shall be repaired to operate. Reinspection required.
|
4/25/2022
|
A17.1-2016 : Elevators
|
5.15.2 Unsealed Overspeed Valve
|
8.6.5.16.5 (Re-Inspect)
|
x
|
|
This elevator has an OSV device installed that is not sealed and is required to have 5 yr full load test. Re-inspection required
|
9/25/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
OSV is not sealed and needs to have a 5 yr full load test performed. Re-inspection required
|
5/29/2024
|