ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.7 Firefighters' Emergency Operation: Operating Procedures
|
|
|
Install fire service recall sign at main recall landing by firefighter's switch. 6.5.2.1
|
12/15/2020
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Unit appears to have emergency generator power, which needs to be scheduled and tested. Re-inspection required
|
11/27/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
x
|
|
Incomplete inspection no keys available to test generator
|
2/22/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Need to perform the following tests to complete inspection: Unit has emergency generate back-up power. Re-inspection required
|
1/27/2025
|