Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A18.1-2005 : Lifts & Chairlifts | 11 CSR 40-5.090 Inspection and Testing | 10.1.5 Installation Placed Inactive or Out of Service | x | x | The platform lift has been placed into inactive status. Per the State of Missouri, Memorandum 003-3, the lift may remain in inactive status for a maximum of 2 years. |