| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.6 - Ventilation | 2.7.5.2 | Permanent means of temperature control are inoperable and shall be repaired, or replaced. | 11/7/2025 | ||
| ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | CSR 40-5.100 State Operating Certificate | 5.100(2) Display of Operating Certificate | Post current operating certificate in elevator machine room. | 10/20/2020 | ||
| A17.1-2016 : Elevators | 5.15 - Overspeed Valve | 8.6.5.16.5 | x | Overspeed valve is sealed and installed in 2015. 2025 year shall have over speed valve tested. Test within 30 days |