Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.36 - Hydraulic Cylinders | 3.18.3 | x | The gland packing on top of the hydraulic cylinder is leaking excessively and shall be repacked. This should not be a re-inspect item. | 10/17/2019 | |
A17.1-2016 : Elevators | 1.17 - Standby power operation | 8.6.4.19.7 (Re-Inspection) | x | Need to test elevator for operation on emergency power. Re-inspection required | 10/17/2024 |