ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
x
|
|
Emergency Power Test & Transfer Verified. However Section 2.7.2.3 violation noted. No visual Emergency Signal provided.
|
9/30/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
The current operating certificate not displayed, the violations from the 2020 annual inspection not corrected.
|
11/1/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
8.6.1.4.1 the Maintenance Control Program has not been initiated by Kone Elevator on this unit.
|
11/1/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2.3 (Elevator Emergency Power Illuminated Signal)
|
|
|
2.27.3.3.8 Emergency Power Visual Signal shall be located at the main landing Fixture.
|
11/1/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
State Operating Certificate Not Current because the violations from 2021 the 5-year Inspection not being corrected.
|
11/1/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
8.6.1.4.1 Maintenance Control Program has not been initiated on this unit.
|
11/1/2024
|