MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Cylinder drain line needs to drain into pit collection container
|
9/8/2021
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
No MCP
|
4/12/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
MRL not up to date
|
4/12/2023
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Remove water and oil from elevator pit. Pits need to be kept dry.
|
4/8/2024
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)6 (Pit Lighting)
|
|
|
Pit light does not illuminate.
|
4/8/2024
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Remove water and oil mixture from elevator pit. Pit shall be kept dry and clean.
|
9/8/2021
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)6 (Pit Lighting)
|
|
|
Pit light does not illuminate.
|
9/8/2021
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)8
|
|
|
COVER HOLE IN PIT FLOOR
|
8/8/2024
|
MO Minimum : Elevators
|
(S) - Fire Service
|
(S)1
|
x
|
x
|
Firefighter phase 2 operation does not override security. 14 days to repair or red tagged. May apply for variance from the state.
|
9/8/2021
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
|
|
Test and log firefighter operation monthly
|
9/8/2021
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
State operating certificate not displayed
|
4/12/2023
|