MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Testing is incomplete. Slack chain portion of testing still needed.
|
6/7/2024
|
|
ASME A18.1-2005 : Lifts & Chairlifts
|
11 CSR 40-5.090 Inspection and Testing
|
10 Routine, Periodic, and Acceptance inspections andTest
|
x
|
|
Testing Incomplete. Unit shutdown at the beginning of test during slack chain/safety jaw testing. Switch and jaws worked but could not get lift to run up and off safeties. All other items need to be tested, including Relief Valve Pressure
|
|
|
ASME A18.1-2005 : Lifts & Chairlifts
|
11 CSR 40-5.090 Inspection and Testing
|
10 Routine, Periodic, and Acceptance inspections andTest
|
x
|
|
Unit is due for a category 5 full load test.
|
4/7/2023
|