ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.7 Firefighters' Emergency Operation: Operating Procedures
|
|
|
Post phase 1 fire service instructions near the fire service key switch in lobby.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2 Design and Construction of Pits
|
|
|
Provide pit ladder rungs to be non-slip type.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.5 Illumination of Pits
|
|
|
Provide code complaint pit lighting.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO state operating certificate shall be displayed in the elevator machine room.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Provide a code compliant MCP including onsite documents.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.5 - Housekeeping
|
8.6.4.9 Cleaning of Car Tops
|
|
|
The top of the car and the hoistway shall be cleaned.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
The pit shall be kept clean. Clean the pit.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
4.8 - Hoistway enclosure
|
8.11.2.1.4(h)
|
|
|
Hoistway walls shall have smooth surfaces. Drywall screws shall not protrude into the hoistway.
|
2/6/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.17 - Door and gate equipment
|
2.11
|
|
|
Adjust upthrust roller bearings for proper clearance to door hanger track (9 & 10 floor).
|
4/19/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.7 Firefighters' Emergency Operation: Operating Procedures
|
|
|
Post phase 1 fire service instructions near the fire service key switch in the lobby. Note: Incorrect instructions are posted.
|
4/19/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.2 - Car top light and outlet
|
2.14.7
|
|
|
Cartop light & GFI do not work.
|
4/19/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.23 - Suspension rope
|
8.11.2.1.3(cc)(3) Replace when diameter is reduced (Re-Inspection)
|
x
|
|
The hoist ropes are rouged and nearing the minimum acceptable diameter. The hoist ropes shall be replaced.
|
8/10/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
3/29/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
The test was stopped due to ID 23591 being red-tagged. This elevator was originally scheduled for an annual and category 5 test. The only items completed were: The hoistway was run, but the pit was not. Door pressure was tested. All other annual and category 5 testing items still need to be witnessed.
|
1/18/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
Standby power operation of the elevator shall be tested.
|
8/10/2021
|