ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
Standby power shall be tested and operate in conformance of code.
|
1/26/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
8.4.10.1.2(C) - Counterweight derailment does not work.
|
11/16/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.17 - Drive machine brake
|
2.24.8.4 Means for Manual Release
|
|
|
Means to manually release machine brake (UPS Unit) shall be operational.
|
1/23/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
All the on site documentation required by A17.1-2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Only schematics are present.
|
12/6/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
MCP, including PM records and monthly fire service test log, not being properly documented.
|
11/27/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.6 - Governor-rope tension devices
|
8.11.2.1.5(g)
|
|
|
The tail sheave switch shall be wired per the manufactures’ specifications.
|
1/23/2022
|