Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.11 Periodic Inspection and Test. x A category 5 test shall be performed and witnessed in 2022. Note: This unit was scheduled for a category 5 test at the same time as the annual. The category 5 test was delayed due to a different unit at this location being Red Tagged. 12/14/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.7 - Fire Extinguisher 8.6.1.6.5 An ABC fire extinguisher with a current test tag shall be mounted in the machine room located convenient to the access door. The current fire extinguisher is a BC type. 12/21/2023
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 2.27.2 x The emergency/standby power shall be tested. Note: Building personnel were not prepared to perform this test. 12/11/2023
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 3.20 - Governor rope 8.6.4.2 x The governor rope is damaged, meets replacement criteria, and shall be replaced. This shall be completed in 14 days or less. The new governor rope shall be tested and tagged as follows: 8.6.3.4.3. After a governor rope is replaced, the governor pull-through force shall be checked as specified in 8.6.4.20.2(b). 8.6.3.4.4. A test tag indicating the date when the pull-through test was performed shall be attached. A new rope data tag conforming to 2.18.5.3 shall be installed at each rope replacement, and the date of the rope replacement shall be recorded in the maintenance records. 12/11/2023