MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
After several unsuccessful attempts, was unable to test unintended movement. Need to perform test to complete inspection. Re-inspection required
|
8/5/2025
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1- 8.6.4.15 Car Emergency Systems (Emergency Light) (Re-Inspection)
|
x
|
|
Emergency light did not work, needs repaired. Re-inspection required
|
8/5/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection)
|
x
|
|
Fire service Phase I indicator at lobby panel does not illuminate when on Phase 1, needs repaired. Re-inspection required
|
8/5/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.23 - Suspension rope
|
8.11.2.1.3(cc)
|
|
|
The belt monitoring device that monitors the hoist belts was showing the fault code “CSB replacement shall be scheduled”. The hoist belts were thoroughly inspected visually and no deterioration was detected. This fault code also did not show immediate replacement. The hoist belts shall be replaced or the monitoring device shall be verified to be operating as the manufacturer has designed. Reinspection required.
|
7/15/2021
|
|
A17.1-2016 : Elevators
|
3.23 - Suspension Means
|
8.6.3.2 (Re-Inspection)
|
x
|
x
|
Hoist belt monitoring device shows "Replace CSB Immediately" code. Hoistway coated steel belts need to be replaced. Red-tagged, Re-inspection required
|
8/5/2025
|