|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.6 - Car emergency signal
|
3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Two-way communication device shall work. Phone is unresponsive.
|
12/10/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.7.5.2
|
|
|
Verify machine room ventilation to meet OEM temperature/humidity requirements. Machine room was excessively hot on arrival.
|
12/10/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.2-2.27.8
|
x
|
|
Phase I key switch is pushed out of bezel at 1st floor landing. Did NOT red tag unit. Reinspect only.
|
12/30/2019
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.11.1 Firefighters Emergency Operation: Monthly Testing
|
|
|
Fire service shall be tested and documented monthly.
|
12/10/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
12/10/2025
|