Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.8 - Pipes, wiring, and ducts 2.8.1 No main line disconnect in machine space. 6/24/2020
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.6 - Car emergency signal 2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) x Phone not working--line dead 8/17/2020