A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Elevators connected to an emergency generator shall be tested for operation on emergency power. Re-inspection required
|
12/30/2024
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Elevators connected to an emergency generator shall be tested for operation on emergency power. Re-inspection required
|
4/7/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
Yes
|
Could not get generator started
|
3/31/2026
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
Yes
|
Yes
|
Phone in car not working.This unit does not have a alarm bell.
|
3/31/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
Yes
|
Emergency communications/phone in car not working,this elevator is not equipped with a alarm bell.
|
5/5/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Could not get generator to start to conduct test
|
5/5/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Generator is being repaired
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
No
|
No
|
A written copy of the MCP shall be kept in the machine room for each unit
|
1/18/2024
|