Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.1.2.1 General Maintenance Requirements Documentation A written maintenance control program is required to be kept on site and up to date
ASME A18.1-2005 : Lifts & Chairlifts 2.8 - Safeties and Speed Governors 2.8 x Platform lift is due for 5 yr full load test, need to perform full load test. Re-inspection required 12/12/2023