Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.9 - Power closing of doors or gates 2.13.3 2.13.4.2.4 - Complete the door time label on the car top. 8/5/2020
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.11 - Disconnecting Means and Control 2.26.4 2.8.2.3.2 - A heat detector and shunt trip disconnect are required for the main power due to the sprinkler head being located near the upper level hoistway entrance as this is the control space for the elevator. Note: This item will be presented to the MO Elevator Safety Board for clarification at the next meeting. 8/5/2020
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.42 - Earthquake Inspection and Tests (Seismic Risk Zone 2 or Greater) 8.4.10 Emegency Operation and Signaling Devices x Seismic protection shall be operational. 7/30/2020
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 4.2 - Hoistway doors 8.11.2.1.4(b) x 2.11.11.2 - The 3rd hoistway door hanger is required to be installed. 7/30/2020