ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
3.26.10 (Auxiliary Power)(Re-Inspection)
|
x
|
|
Need to perform annual emergency power operation. Re-inspection required
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Need to perform the annual emergency power operation on elevator. Re-inspection required
|
1/29/2025
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Perform the annual emergency power operation on the elevator
|
9/30/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test is incomplete, need to perform the following tests to complete inspection: Car & counterweight buffers, pull out, pull thru. Re-inspection required
|
1/29/2025
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Testing in complete. Must test, counterweight buffer, car buffer, pull out and pull through, set the safeties, and do 125% brake test.
|
12/16/2024
|