Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 3.26.10 (Auxiliary Power)(Re-Inspection) Yes No Need to perform annual emergency power operation. Re-inspection required 11/12/2025
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 3.26.10 (Auxiliary Power)(Re-Inspection) Yes No Need to perform annual emergency power operation. Re-inspection required 3/17/2026
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) Yes No Need to perform the annual emergency power operation on elevator. Re-inspection required 1/29/2025
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) Yes No Perform the annual emergency power operation on the elevator 9/30/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 2.27.2 Yes No Standby power selection operation not working correctly, elevator did not connect to the generator. Re-inspection required
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing (3) Testing Procedures (Re-Inspect) Yes No Test is incomplete, need to perform the following tests to complete inspection: Car & counterweight buffers, pull out, pull thru. Re-inspection required 1/29/2025
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing (3) Testing Procedures (Re-Inspect) Yes No Testing in complete. Must test, counterweight buffer, car buffer, pull out and pull through, set the safeties, and do 125% brake test. 12/16/2024