A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency phone shall be operational
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.15 - sign and operating device symbols
|
2.26.12
|
x
|
|
ost in case of ?re signs on all ?oor openings
|
|
|
A17.1-2016 : Elevators
|
1.15 - sign and operating device symbols
|
2.26.12
|
x
|
|
Correct the position indicator. notes all ?oors as rear door
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
2.27.2.3 (Elevator Emergency Power Illuminated Signal)
|
x
|
|
Provide an emergency power jewel in the lobby
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
2.16.8
|
x
|
|
Test emergency power for ?nal acceptance
|
|
|
A17.1-2016 : Elevators
|
2.1 - Access to machine space
|
2.7.1.1
|
x
|
|
Provide at least a class B rated door for the control space. Control space door shall be self-closing and self-locking
|
|
|
A17.1-2016 : Elevators
|
2.4 - Machine space
|
8.6.4.8 Machine Room and Machinery Space
|
x
|
|
Close all control space penetrations
|
|
|
A17.1-2016 : Elevators
|
2.4 - Machine space
|
2.8.1
|
x
|
|
Water conveying devices are not allowed in the Control Space
|
|
|
A17.1-2016 : Elevators
|
2.3 - Lighting and receptacles
|
2.7.9.1
|
x
|
|
GFIC receptacle is required in the control space
|
|
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
2.26.4.5
|
x
|
|
Install a heat detector with in 24 in of sprinkler head to activate the shunt trip.
|
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Seal all hoistway penetrations
|
|
|
A17.1-2016 : Elevators
|
3.11 - Hoistway smoke control
|
8.10.2.2.3(q)
|
x
|
|
Install rated ?re damper in hoistway vent inlet
|
|
|
A17.1-2016 : Elevators
|
11.3 - Enclosure of Rooms and Spaces
|
2.7.1.2
|
x
|
|
Machine room backs up to a 2hr rated hoistway and shall also be 2hr rated
|
|
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.2 Phase I Operation Recall by Initiating Device
|
x
|
x
|
Complete ?nal acceptance by testing all heat and smoke detectors
|
|
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.2 Phase I Operation Recall by Initiating Device
|
x
|
x
|
Install a smoke detector in the control space
|
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.3
|
x
|
|
Install the pit light switch adjacent to the pit ladder
|
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Grout the basement door Sill
|
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Raise sprinkler head to hoistway overhead and within 24 inches of the heat detector
|
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Landing shall be near hoistway sill level currently 16inches low
|
|