ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.7 - Fire Extinguisher
|
8.6.1.6.5
|
|
|
An ABC fire extinguisher with a current test tag shall be mounted in the machine room located convenient to the access door.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
|
|
The penetrations in the hoistway shall be sealed with approved solid material.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.10 - Numbering of elevators, machines, and disconnect switches
|
2.29.1
|
|
|
An identification number or letter shall be provided adjacent to or on every elevator entrance at the designated level, and be a minimum of 3 inches in height.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.15 - sign and operating device symbols
|
8.11.2.1.1(o)
|
|
|
All door entrance frames shall be provided with braille tags. 8.10.2.2.1(o)
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
|
|
All wireway and electrical devices shall have covers installed.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
The pit shall be cleaned.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
|
|
All wireway and electrical devices shall have covers installed.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
The pit shall be cleaned.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.28 - Counterweight and counterweight buffer
|
8.11.2.1.3(m)
|
|
|
Clean the concrete off the counterweight frame.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
Fire service operation shall be tested.
|
3/5/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
3/5/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.2-2.27.8
|
x
|
x
|
The building fire control station shall be installed and tested.
|
9/22/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.6 - Car emergency signal
|
8.11.2.1.1(f) (Insp code) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
The in car emergency telephone shall be operational.
|
9/18/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.2-2.27.8
|
x
|
x
|
The building fire control station shall be installed and tested.
|
9/18/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.4 - Machine space
|
2.7.1.1
|
x
|
|
The penetrations on the machine room shall be sealed with approved solid material.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.7 - Fire Extinguisher
|
8.6.1.6.5
|
x
|
|
An ABC fire extinguisher with a current test tag shall be mounted in the machine room located convenient to the access door.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
The penetrations in the hoistway shall be sealed with approved solid material.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.6 Sump Pump Covers
|
x
|
|
The sump pump in the pit shall be covered. The cover shall be secured and level with the pit floor.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.10 - Numbering of elevators, machines, and disconnect switches
|
2.29.1
|
x
|
|
The machines, controller, governor, and disconnects shall have an identification number or letter painted or engraved, or securely attached, corresponding to the elevator they serve, and shall be a minimum of 2" in height.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.10 - Numbering of elevators, machines, and disconnect switches
|
2.29.1
|
x
|
|
An identification number or letter shall be provided adjacent to or on every elevator entrance at the designated level, and be a minimum of 3 inches in height.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.4 Access to Pit
|
x
|
|
A pit ladder shall be installed.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
2.8.1
|
x
|
|
Machine room wiring shall be enclosed.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
2.8.1
|
x
|
|
All temporary wiring must be removed, and cars shall be connected to permanent power.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.15 - sign and operating device symbols
|
8.11.2.1.1(o)
|
x
|
|
All door entrance frames shall be provided with braille tags. 8.10.2.2.1(o)
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
All wireway and electrical devices shall have covers installed.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
A light switch, lighting and GFCI receptacle must be installed and operational in the overhead.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.8
|
x
|
|
A light switch, light and GFCI receptacle must be installed and operational in the pit.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.2-2.27.8
|
x
|
x
|
The building fire control station shall be installed and tested.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
x
|
|
Standby emergency power operation shall be tested.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.4 - Sills and car floor
|
8.11.2.1.1(d)
|
x
|
|
The elevator lobby floors shall be finished and hall sills shall be grouted.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
The building work in progress includes running some or all of the elevators in this group under standby emergency power. When work is complete, the tests and requirements of A17.1-2005 - 8.10.2.2 shall apply.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
The building work in progress includes a remote fire control panel. When work is complete, the tests and requirements of A17.1-2005 - 8.10.2.2.3 shall apply.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
Work is still in progress and other deficiencies may follow as work progresses.
|
9/14/2020
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
The following tests have be witnessed: Governor pullout/pull thru, governor switch and jaw, over speed safety test, 125% rated load test, unintended movement with 125%, unintended movement with 0%, ascending car over speed, high speed car buffer test with rated load, high speed counterweight buffer test with no load, and ran the hoistway. All other acceptance testing items shall be performed and witnessed.
|
9/14/2020
|