ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.11 Periodic Inspection and Test.
|
x
|
|
Incomplete test. Check standby power, fire service, pressure switch and oil timer upon return.
|
11/21/2020
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Need to perform testing of emergency generator power. Re-inspection required
|
9/30/2023
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
This elevator has a backup emergency generator power that is used in case of a power outage. This system was setup and scheduled to be tested on 10/26/24, however the hospital staff failed to initiate the emergency generator test. Reinspection is required.
|
10/30/2024
|