Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing (3) Testing Procedures (Re-Inspect) x Need to perform testing of emergency generator power. Re-inspection required 9/30/2023
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.11 Periodic Inspection and Test. x Incomplete test. Check standby power, fire service, pressure switch and oil timer upon return. 11/21/2020
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) x This elevator has a backup emergency generator power that is used in case of a power outage. This system was setup and scheduled to be tested on 10/26/24, however the hospital staff failed to initiate the emergency generator test. Reinspection is required. 10/30/2024