Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.6 - Car emergency signal 3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) x The in car emergency telephone shall be operational.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 3.12 - Pipes, wiring, and ducts 2.8 x Sprinkler riser shall not run entire hoistway. Take corrective action or apply for a variance.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.6 - Car emergency signal 3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) x The in car emergency telephone shall be operational. 5/22/2023
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.6 - Car emergency signal 3.27 (Hydro) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days) x Emergency phone doesn't work. 3/13/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 1.17 - Standby power operation 3.26.10 (Auxiliary Power)(Re-Inspection) x Battery lowering is not working. 3/13/2024