A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
|
|
all sheetrock screws projecting into the hoistway need to be cut off flush to the wall
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.11.2.1.1(f) (Insp code) Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
the emergency phone did not work.
|
3/3/2023
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.1.6(h) Phase 2 Audible/Visual Signal (Re-Inspection)
|
x
|
|
The audible signal is not work
|
|