Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | Need to perform emergency generator power operation testing. Re-inspection required | 3/11/2024 | |
A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.2 Phase I Operation Recall by Initiating Device | x | x | Provide testing of Phase I & II, smokes and heats associated with elevator. | 10/5/2020 |