A17.1-2016 : Elevators
|
1.12 - Car enclosure
|
2.14.2.1
|
x
|
|
flooring to be nstalled
|
3/9/2022
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.6 Verification of Telephone Operability
|
x
|
|
phone not working
|
3/9/2022
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.1(a)
|
|
|
Provide proper MCP in machine room.
|
3/24/2022
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Penetration in hoistway at oil line must be fire protected and sealed
|
3/9/2022
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.4
|
x
|
|
no pit ladder
|
3/9/2022
|