Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
A17.1-2016 : Elevators | 1.17 - Standby power operation | 3.26.10 | x | Failed Cat 1 Standby power test. Re-inspection required | 4/29/2024 | |
MO Minimum : Elevators | (G) - Maintenance, Repair and Replacements | 8.6.3.10 replacement of Hydraulic jack,Plunger,Cylinder,Tanks,and Anticreep Leveling Device | x | x | Excessive leakback thru check valve---releveling excessively must be repaired within 30 days or remove from service | 5/27/2020 |