A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.10.2.2.1(q)
|
x
|
|
Emergency power shall be tested.
|
1/18/2021
|
A17.1-2016 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
8.10.2.2.2(m)
|
x
|
|
All covers shall be installed.
|
1/18/2021
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.10.2.2.5(a)
|
x
|
|
The sump pump discharge pipe shall be secured.
|
1/18/2021
|
A17.1-2016 : Elevators
|
1.15 - sign and operating device symbols
|
8.11.2.1.1(o)
|
x
|
|
All signage shall be installed when construction is completed.
|
1/18/2021
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1 Hoistway Enclosure Walls
|
x
|
|
All penetrations in the hoistway shall be sealed.
|
1/18/2021
|