A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3
|
x
|
x
|
Phase 1 & 2 fire service and all initiating devices shall be tested.
|
6/30/2021
|
A17.1-2016 : Elevators
|
4.8 - Hoistway enclosure
|
8.10.2.2.4(h)
|
x
|
|
Screws protruding into the hoistway shall be removed.
|
6/30/2021
|
A17.1-2016 : Elevators
|
4.8 - Hoistway enclosure
|
8.10.2.2.4(h)
|
x
|
|
The door at the top of the hoistway shall be blocked up.
|
6/30/2021
|
A17.1-2016 : Elevators
|
3.13 - Windows, projections, recesses, and setbacks
|
2.1.6
|
x
|
|
Beams in the back of the hoistway and concrete ledge in the pit shall be beveled to an angle not less than 75 degrees.
|
6/30/2021
|
A17.1-2016 : Elevators
|
2.1 - Access to machine space
|
2.7.3.4
|
x
|
|
The machine room door shall be self-closing and self-locking.
|
6/30/2021
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency phone is not working. Re-inspection required
|
4/19/2022
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.6 Verification of Telephone Operability
|
|
|
Phone line monitor is not working correctly
|
6/7/2022
|
A17.1-2016 : Elevators
|
2.42 - Earthquake Inspection and Tests (Seismic Risk Zone 2 or Greater)
|
8.4
|
|
|
Counterweight derailment device is not working
|
4/5/2022
|
A17.1-2016 : Elevators
|
11.10 - Governor, Overspeed Switch
|
2.18.7.2
|
|
|
Govenor tail sheave switch is not working
|
4/5/2022
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Phone not working correctly, repair as needed.
|
6/8/2022
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.6 Verification of Telephone Operability
|
|
|
Phone line monitoring not working correctly, repair as needed. Reinspect required.
|
4/5/2022
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Video monitoring is not working and shall be operational. (Phone is working)
|
2/29/2024
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
The pit shall be kept clean. Clean the pit.
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Video monitoring does not work.
|
|