A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.6 Verification of Telephone Operability
|
x
|
|
Message states Elevator “B”, caller ID labeled “A”. Caller ID needs to be for “B”
|
12/15/2021
|
A17.1-2016 : Elevators
|
6.5 -Acceptance Checklist for Firefighters' Service (ASME A17.1-2000 and CSA B44-00): Automatic Elevators
|
3.27.1
|
x
|
|
17.1-2016: 2.27.9 : Replace missing hall fire signage “ in case of fire…..”
|
12/15/2021
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
3.1
|
x
|
|
TOP OF HOISTWAY: Touch-up fire caulking on non-factory horizontal joints and cracks and Northeast vertical corner
|
12/15/2021
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Pit Sump Pump is required(installed) , electrical outlet missing. Install outlet, connect pump, test pump operation.
|
12/15/2021
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.6 Verification of Telephone Operability
|
|
|
Message states Elevator “B”, caller ID labeled “A”. Caller ID needs to be for “B”
|
12/15/2021
|
A17.1-2016 : Elevators
|
6.5 -Acceptance Checklist for Firefighters' Service (ASME A17.1-2000 and CSA B44-00): Automatic Elevators
|
3.27.1
|
x
|
|
17.1-2016: 2.27.9 : Replace missing hall fire signage “ in case of fire…..”
|
12/15/2021
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
3.1
|
|
|
TOP OF HOISTWAY: Touch-up fire caulking on non-factory horizontal joints and cracks and Northeast vertical corner
|
12/15/2021
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Pit Sump Pump is required(installed) , electrical outlet missing. Install outlet, connect pump, test pump operation.
|
12/15/2021
|