MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.3.1 Replacement Parts
|
|
|
Need permanent test connection installed on control valve.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.2.1 Repair Parts
|
|
|
Rail bracket at top floor needs to be welded to mounting beam, it was missing.
|
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
|
|
Fire service shall be tested monthly and recorded on log in machine room.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Testing of the relief valve has not been completed. There is no port for the gauge to be connected. Reinspect within 14 days
|
4/29/2025
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Elevator pit appears to not have a working sumo pump. There is at least 1 foot of water in the pit. Pit shall be kept clean and dry
|
4/29/2025
|