|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
Yes
|
No
|
Hoistway blocks above headers need sealed. Penetrations need fire caulk.
|
9/13/2022
|
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)8
|
Yes
|
No
|
Sump hole needs non combustible flat cover
|
9/13/2022
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1.1.1 Emergency communications and alarm not functioning (Red Tag)
|
Yes
|
Yes
|
Emergency phone not working. Brd.
|
9/13/2022
|
|
A17.1-2016 : Elevators
|
2.17 - Drive machine brake
|
2.24.8.3
|
Yes
|
Yes
|
Brake won't hold 125%
|
9/13/2022
|