| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | Yes | No | Top of hoistway walls need to be filled or covered to ceiling. Some small holes in hatch need to be sealed. | 6/13/2022 |