| Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
|---|---|---|---|---|---|---|
| A17.1-2016 : Elevators | 1.17 - Standby power operation | 8.6.4.19.7 (Re-Inspection) | Yes | No | Provide testing of the elevator on emergency power. | |
| A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.3.7 Phase 2 Operation Panel | Yes | No | Buttons for Phase II not working. (COP buttons work). Repair as needed. |