Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel Yes No Buttons for Phase II not working. (COP buttons work). Repair as needed.
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) Yes No Provide testing of the elevator on emergency power.