A17.1-2016 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2(d)(1)
|
|
|
Evacuation procedures for elevators by authorized persons and emergency personnel shall be available on-site.
|
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.11.1 Firefighters’ Emergency Operation Documentation
|
|
|
A record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be kept on site.
|
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2 On-Site Documentation
|
x
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room.
|
5/31/2022
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.1.6(h) Audible/Visual Signal (Re-Inspection)
|
x
|
|
The fire service visual indicator in the hall shall work.
|
5/31/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
All hall fixtures shall be properly installed and flush with the mounting surface.
|
5/31/2022
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1(b)
|
x
|
|
Seal the ceiling joint and edges at the top of the hoistway.
|
5/31/2022
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1(b)
|
x
|
|
Remove any wood and properly grout the hoistway door frames and all gaps and penetrations in the hoistway walls.
|
5/31/2022
|
A17.1-2016 : Elevators
|
1.3 - Operating control devices
|
8.10.3.2.1(c)
|
x
|
|
The main egress star on the COP and the numbers on the door jamb shall be at the 2nd floor.
|
5/31/2022
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1(b)
|
x
|
|
Fire caulk all penetrations including, but not limited to, the sprinkler pipe, the sump discharge line and electrical conduit.
|
5/31/2022
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Provide documentation of the sump pump capacity.
|
5/31/2022
|