Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
A17.1-2016 : Elevators | 2.7 - Fire Extinguisher | 8.6.1.6.5 | x | Fire Extinguisher shall be provided @ the Control Room on Level 3. | 1/4/2024 | |
A17.1-2016 : Elevators | 3.10 - Hoistway construction | 2.1 | x | Item 2.1.6.2(a) Projection inside the elevator hoistway (pit) shall not be greater than 4 inches. Projection is 6.5 inches which will require a 75 degree bevel | 1/4/2024 | |
A17.1-2016 : Elevators | 6.4 - Firefighters' service (A17.1b-1989 and later editions) | 2.27.3.2 Phase I Operation Recall by Initiating Device | x | x | Item 2.27.3.2.1(b) Heat Device & Smoke innating shall be functional at the Elevator Main Line Disconnect & 110 Elevator Disconnect in the Electrical Control Room at the Main Level, Did not Red Tag Elevator locked out by Elevator Contractor Must Reinspect.. | 1/4/2024 |