Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | Fire service needs to be re-tested. Remove heat detector from overhead. Heat detector shall be installed at top landing within 24" from sprinkler head. Note: Phase 1 & 2 operation were successfully tested, however some smokes and heats were not functioning correctly. | 8/15/2024 | |
A17.1-2016 : Elevators | 3.10 - Hoistway construction | 3.1 | x | Seal all penetrations in the hoistway. | 8/15/2024 | |
A17.1-2016 : Elevators | 1.17 - Standby power operation | 3.26.10 | x | Battery lowering operation shall be functional. | 8/15/2024 |