A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Fire caulk/fill holes, gaps, cracks, and voids in hoistway walls.
|
8/13/2024
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
2.26.4.1
|
x
|
|
Controller disconnects shall have feed location labeled.
|
8/13/2024
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.2 Phase I Operation Recall by Initiating Device
|
x
|
x
|
FAID testing failed to initiate elevator recall.
|
8/13/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.10 Acceptance Inspection and Test
|
x
|
|
Fire service phase 1 & 2 need to be tested.
|
8/13/2024
|