Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 1.17 - Standby power operation 8.6.4.19.7 (Re-Inspection) x Emergency power generator to be tested when lobby panel is completed, providing selector switch 8/12/2024
A17.1-2016 : Elevators 2.11 - Disconnecting Means and Control 3.26.1 Due to the addition of sprinkler heads in the elevator machine room a heat detector is required within 24 inches of every head in the machine room to activate the shunt trip and tested 10/11/2024
A17.1-2016 : Elevators 3.10 - Hoistway construction 8.7.2.1.1 Hoistway Enclosure Walls x 3.10 Hoistway construction - 3.1 - Seal all hoistway penetrations and non factory seams in core board. 8/12/2024
A17.1-2016 : Elevators 3.13 - Windows, projections, recesses, and setbacks 2.1.5 x All beveled surfaces shall be 70 degree bevel and capable of withstanding a 100# per soft load at aright angle 8/12/2024
A17.1-2016 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 3.27 x x Due to the addition of sprinkler heads in the elevator pit a smoke detector shall be installed in the elevator pit and recall tested. 8/26/2024